Social Media Sidebar

Announcement

Please sign up, comment on articles and bring your friends!

Current poll

PlanetTech is asking:

What do you think about our new web site?

Love it, indeed
Really good solution
Same as old one
The old one was better
This is a new option

Quote of the day

We are all now connected by the Internet, like neurons in a giant brain.

 

Stephen Hawking

 

Potential delay for first test flight of India's spaceplane demonstrator

RATE THIS! +28
Posted in Science on 2nd Jan, 2016 05:23 PM by AlexMuller

The Indian Space Research Organisation may have to delay the first test flight of its experimental Reusable Launch Vehicle-Technology Demonstrator (RLV-TD) spaceplane. The unmanned sub-orbital spacecraft, which is similar in design to the US Air Force's X-37B, was scheduled to be launched in February.

 
According to a report in the New Indian Express, a minor leak in the flight systems of the RLV-TD led to the potential setback. K Sivan, director of the Vikram Sarabhai Space Centre (VSSC), where the craft is being developed, told the paper that the spacecraft needed to be reassembled, which could cause a significant delay if more problems occur.
 
The RLV-TD is a two-stage scaled prototype of India's Avatar spacecraft designed to drastically reduce the cost of launching payloads into orbit from US$5,000 per kilogram (2.2 lb) to US$500. RLV-TD is a winged technology demonstrator for testing flight and propulsion systems that will allow the completed Avatar to return to Earth for a controlled landing like a conventional aircraft.
 
A series of flights of the will test the RLV-TD's ability to carry out hypersonic flight, landings, return flight, and scramjet propulsion before a full-sized vehicle is built. The demonstrator will lift off atop a conventional rocket booster, which will accelerate it to Mach 5 (3,800 mph, 6,125 km/h). After separation, the winged craft will coast to an altitude of 100 km (62 mi) before making a controlled reentry.
 
When the atmosphere is thick enough, the flight surfaces take over and the RLV-TD will glide to the recovery area for a splashdown in the Bay of Bengal. The sea recovery is necessary because the spaceplane requires a 5 km- (3.1 mi-) long runway, which India does not currently possess.
 
This is the third delay for the program, which had an initial launch date in mid-2015.

Tags: spacespaceplanehardwarespacecraftresearchIndia

Read original article » Back to category

Comments



 

Recent headlines

  • Posted in Software on 2017-06-23 12:32:59
    Google’s AI subsidiary DeepMind is partnering with.....read more
    Posted in Science on 2017-06-23 12:40:53
    Likely Mars sized planet at two times the distance to.....read more
    Posted in Science on 2017-06-23 12:14:38
    Queen's Speech: Plan aims to secure space sector..read more
    Posted in Hardware on 2017-06-22 04:47:33
    Google can turn an ordinary PC into a deep learning machine..read more
    Posted in Science on 2017-06-22 04:38:36
    Musk Wants SpaceX’s Trips To Mars To Be Like Riding.....read more
Posted in Business on 2013-10-10 01:33
China is working towards a manned lunar mission in about.....read more
Posted in Business on 2013-10-20 07:17
Spacex says China is their main competitor for commercial.....read more
Posted in Software on 2013-10-20 06:43
Pirate Bay Browser Clocks 1,000,000 Downloads..read more
Posted in Medicine on 2013-10-10 02:10
Google reportedly investing hundreds of millions into new.....read more
Posted in Medicine on 2013-10-14 03:13
Endothelial Cells Can Repair and Regenerate Organs,.....read more
Posted in Science on 01.01.2010
Spacex says China is their main competitor for commercial.....read more
Posted in Science on 01.01.2010
Staring at Your Phone Could Be Making You Short Sighted..read more
Posted in Science on 01.01.2010
Oculus Rift virtual reality headset coming to mobile, but.....read more
Posted in Science on 01.01.2010
China is working towards a manned lunar mission in about.....read more
Posted in Science on 01.01.2010
Delivering drugs via nanoparticles to target mitochondria..read more

Recent Blog Posts

  • Posted by AlexMuller
    Nanoparticle vaccine shows potential as immunotherapy to fight.....read more
    Posted by AlexMuller
    Obesity is top cause of preventable life-years lost, study shows..read more
    Posted by AlexMuller
    Light can be utilized to control gene function..read more
    Posted by AlexMuller
    Brain stimulation restores memory during lapses, research shows..read more
    Posted by AlexMuller
    Wax worm caterpillar will eat plastic shopping bags: New.....read more

Login to your Account

Login to your PlanetTech Account here

Username:
Password:
Remember me
or

Create a New Account

You just need username and password

The following errors occured:
Username:
Email:
Password:
Verify password:
Remember me